Energy

Switchrooms, substations and battery storage.

Design study

A transportable switchroom on bored piers

A 12 metre switchroom arrives on a truck, fitted out and tested. It is craned onto eight concrete piers and bolted down the same day.

Design study

Battery storage containers and the fire wall between them

Four battery containers stand in a row as two pairs, each about 6 metres long, with a concrete fire wall between the pairs.

Design study

A transformer pad in an oil bund, with a fire wall

Two large power transformers stand side by side, each inside its own concrete bund, with a fire wall more than 7 metres high between them.

Design study

An inverter skid on a raft with cable openings

A power-conversion skid for a solar site arrives as one piece, about 6 metres long. One crane lift sets it on a concrete slab.

Design study

A padmount substation pad where the standard one will not do

A kiosk substation normally sits on a simple slab at the surface. Here the top of the ground is old fill that will keep settling.

Design study

A chamber substation under a forecourt, with an equipment hatch

A substation room sits in a basement under a public forecourt, with two transformers and their switchgear behind fire-rated concrete walls.

Design study

Equipment stands in a high-voltage switchyard

One bay of a high-voltage switchyard has a circuit breaker and a disconnector, each on a galvanised steel stand high enough to walk beneath.

Design study

A two-tier pipe and cable rack between plant buildings

A 30 metre steel rack carries services between two plant buildings, with pipes on the lower tier and cable ladders above.

Design study

One structural set for a range of transportable switchrooms

One transportable switchroom in three lengths, from 6 to 12 metres. Each room is fitted out in the factory, lifted onto a truck and set down on concrete pads.

Design study

Lifting and transporting a transportable switchroom

A 12 metre switchroom leaves the factory fitted out and tested. A crane lifts it at four points, a low-loader carries it by road, and a second lift sets it on its footings.

Design study

A transportable switchroom for a cyclonic region

A 12 metre switchroom for a site where cyclones cross the coast. It arrives fitted out and is craned onto concrete footings.

Design study

Two-storey stacked modules and their tie-down

Two site office modules are stacked two high by crane, with a walkway along the front of the upper floor and a stair down from one end.

Design study

A substation control building

A control building is the room a substation is run from. This one has blockwork walls and a steel roof, with the relay room over a cable basement.

Design study

A landing gantry and lightning mast in a switchyard

Where a power line reaches a switchyard, its conductors are tied off to a steel gantry. A slender lightning mast stands beside it and shields the equipment below.

Design study

Cable trenches and pits with trafficable covers

A substation's cables run across the yard in a concrete trench with covers that lift out. One length crosses the access way, where maintenance trucks drive over it.

Design study

A kiosk substation on a sloping site

A kiosk substation has to stand level, with room to open its doors and work at them. On this sloping verge, a platform is cut into the hill.

Design study

An imported battery container checked for local wind and earthquake

A battery container is made overseas and shipped to a site here. Before it is installed, it is checked against local wind and earthquake requirements.

Design study

A foundation for a synchronous condenser

A synchronous condenser is a very large machine that spins freely to steady the grid. This one and its flywheel stand on one concrete block about 15 metres long.

Design study

Seismic restraint of switchboards and cable tray in a plant room

A plant room twenty metres up a building holds the main switchboard, a UPS and a battery rack, with a cable tray hung above them.

Design study

Fast-charger pads and a canopy

Six charging bays under one steel canopy, with three fast chargers at the head of the bays. The canopy reaches forward from a single row of columns, so nothing stands among the cars.

Design study

An overhead charging gantry in a bus depot

Four bus lanes under one steel gantry, with a charger above each lane that lowers onto the roof of the bus parked beneath it.

Design study

A noise wall round a battery site: post and footing tables

An acoustic wall stands between a battery site's cooling fans and the nearest houses: steel posts in concrete piers, with panels slotted between.

A single beam or a full structure.