A two-tier pipe and cable rack between plant buildings

Six steel bents on pad footings between two buildings, each bent cross braced between its two columns. Four pipes run on the lower tier and three cable ladders on the upper tier. Struts tie the rack to each building, with X bracing in the middle span.
Drag to turn. Right-drag to move. Click in, then scroll to zoom.Drag to turn. Two fingers to move and zoom.

Design study

A 30 metre steel rack carries services between two plant buildings, with pipes on the lower tier and cable ladders above.

A site road passes beneath, so the rack stands high on cross braced steel frames and is tied to the building at each end.

One cable ladder is left empty, so later cables go in without new steel.

A single beam or a full structure.