A chamber substation under a forecourt, with an equipment hatch

Design study
A substation room sits in a basement under a public forecourt, with two transformers and their switchgear behind fire-rated concrete walls.
The transformers are lowered by crane from the street through a hatch in the forecourt, closed by three precast covers that sit flush with the paving.
The covers lift out again, so a transformer can be replaced without breaking into the building.