Lifting and transporting a transportable switchroom

Design study
A 12 metre switchroom leaves the factory fitted out and tested. A crane lifts it at four points, a low-loader carries it by road, and a second lift sets it on its footings.
The lifting points are placed so the room hangs level and lands square, and the switchgear inside travels undisturbed.
It arrives ready to bolt down and connect.