Lifting and transporting a transportable switchroom

A steel-framed switchroom on two concrete strip footings, with a rectangular spreader frame above its roof, four slings dropping to lugs on the base frame, a single spreader bar above the frame, and two slings rising from the bar to one crane hook.
Drag to turn. Right-drag to move. Click in, then scroll to zoom.Drag to turn. Two fingers to move and zoom.

Design study

A 12 metre switchroom leaves the factory fitted out and tested. A crane lifts it at four points, a low-loader carries it by road, and a second lift sets it on its footings.

The lifting points are placed so the room hangs level and lands square, and the switchgear inside travels undisturbed.

It arrives ready to bolt down and connect.