A transportable switchroom on bored piers

Design study
A 12 metre switchroom arrives on a truck, fitted out and tested. It is craned onto eight concrete piers and bolted down the same day.
The ground is clay that moves with the seasons, so the room stands clear of it on piers that reach past the movement.
The piers are in before the room arrives, so it goes from truck to footings in one lift.