An older crane runway assessed for a heavier crane

One span of an existing crane runway between two steel columns: a rolled girder with a channel capping its top flange and a rail on top, web stiffeners stopped short of the bottom flange, and a new steel plate bolted under it. The crane's end carriage is shown as an outline on the rail.
Drag to turn. Right-drag to move. Click in, then scroll to zoom.Drag to turn. Two fingers to move and zoom.

Design study

A steel girder along the wall of a heavy workshop carries the rail for an overhead crane. A heavier crane is to replace the old one.

Worn welds are removed, and a new plate bolted under the girder strengthens it for the heavier crane.

The existing girder stays in place.

A single beam or a full structure.

Tell us what is being built or assessed, and where it is.

Enquire