A new deck for a forest trail bridge

A short timber bridge over a creek. Five round log girders sit on a concrete sill at each bank. Across them lie new deck planks, with two tracks of running planks on top, a kerb on blocks each side and a post and rail fence along each edge.
Drag to turn. Right-drag to move. Click in, then scroll to zoom.Drag to turn. Two fingers to move and zoom.

Design study

A timber bridge carries a forest fire trail over a small creek. Its deck and kerbs are worn out, but the log girders underneath are still sound.

The old decking comes off, and new hardwood planks, kerbs and rails go on the girders that are already there, so fire tankers can keep using the trail.

Keeping the girders means the trail is closed for a short time only.

A single beam or a full structure.

Tell us what is being built or assessed, and where it is.

Enquire