Load rating of a timber girder bridge

Design study
A timber bridge carries a council road over a creek. An inspection has found a hollow in one log girder and rot at the end of another.
A load limit is posted straight away. Two steel beams go in beside the damaged girders, and the limit rises to 15 tonnes, signed at each approach.
The road stays open to cars and light trucks while the repair is arranged.