A steel beam footbridge over a creek

Design study
A 12 metre footbridge over a creek in a public reserve: two galvanised steel beams, a hardwood deck and a baluster handrail each side.
The creek banks are hard to reach with heavy plant. The bridge arrives in one piece and lands on a small concrete abutment on each bank, clear of the water.
It goes in with one lift by a small crane.