Replacing a rotted abutment under a timber bridge

A two-span timber girder bridge on a trestle pier. At the near end a new concrete abutment with splayed wing walls stands on a wide footing in an open excavation, and a temporary steel frame on timber mats holds up the girders just in front of it. The far end still sits on its timber abutment.
Drag to turn. Right-drag to move. Click in, then scroll to zoom.Drag to turn. Two fingers to move and zoom.

Design study

A two-span timber bridge carries a rural road over a creek. One timber abutment has rotted at ground level.

The bridge stays in place. A temporary steel frame holds up the end of the span while the old timbers come out and a concrete abutment goes in beneath it.

The road reopens without the cost of a new bridge.