Replacing a rotted abutment under a timber bridge

Design study
A two-span timber bridge carries a rural road over a creek. One timber abutment has rotted at ground level.
The bridge stays in place. A temporary steel frame holds up the end of the span while the old timbers come out and a concrete abutment goes in beneath it.
The road reopens without the cost of a new bridge.