Jacking and skidding a transformer onto its pad

Design study
A transformer too heavy for the cranes on site is slid from the truck onto its concrete plinth, along two level steel tracks on stacks of hardwood.
The tracks pass over the bund wall without touching it. At the plinth, jacks take the weight, the tracks come out, and the transformer is lowered into place.
No heavy crane has to be brought to site.