A support structure for a transfer chute, with a liner-change platform

A four-column braced steel structure on pad footings. Two beams at the top carry the outlines of the hood and lined chute, a platform below has a stair, and a monorail runs out past one face. Conveyor A arrives at the top and conveyor B passes beneath, both drawn as outlines.
Drag to turn. Right-drag to move. Click in, then scroll to zoom.Drag to turn. Two fingers to move and zoom.

Design study

One conveyor ends here and another starts. Ore drops 5 metres through a steel chute onto the lower belt, running at right angles.

Four columns carry the chute clear of both conveyors. Its wear liners are changed through doors in the wall, from a platform with lifting points and a monorail above.

Worn liners come out and new ones go in without scaffolding.

A single beam or a full structure.