An existing beam taking a new 2 t hoist

A steel beam spanning between two building columns, capped along its top flange by a channel bolted through in two rows. A hoist trolley runs on the bottom flange at midspan, with the hoist and a 2 t load drawn in outline below.
Drag to turn. Right-drag to move. Click in, then scroll to zoom.Drag to turn. Two fingers to move and zoom.

Design study

An existing steel beam spans 7.5 metres above a plant floor. A 2 tonne electric hoist is to run along it and lift equipment from the floor below.

The beam is strengthened for the hoist with a steel channel bolted along its top.

The work is all bolted, so the plant below keeps running.

A single beam or a full structure.

Tell us what is being built or assessed, and where it is.